Project Title: PSR 2 Revamp Project 2009 EPCC Main-Contractor: Foster Wheeler Client: Malaysia Refining Company/Petronas Penapisan Melaka, Sg. Udang Year: 2009 Scope of Work: Piping Construction & Mechanical Equipment Erection Safe Manhours: 1.3 Millions
PBH was awarded the contract from Foster Wheeler for Mechanical Package (A2). Total dia-inch involved was 55,000 and 3,500 MT for steel structure fabrication and installation.