LOTTE Chemical Titan

Track Records

LOTTE Chemical Titan

Project Title: EPCC for TPP3
Project EPCC Main-Contractor: LOTTE Engineering Corporation Limited
Client: LOTTE Chemical Titan, Pasir Gudang
Year: 2017
Scope of Work: Piping and Mechanical
Safe Manhours: 1,300,000

PBH was awarded the Piping and Mechanical Package from Lotte E&C Sdn. Bhd for the new expansion of TPP3 Plant located in Pasir Gudang, Johor.
With the total of 45,000 DI and 700 tons of steel structure erection with 5,000m2 of cladding works we executed in total of 12 months and successfully completed within the given schedule in average of 150 workers per month.

Xray tetra bandfish sleeper lefteye flounder delta smelt canary rockfish slender snipe eel icefish king of herring pikeperch sailfin silverside. Sacramento splittail fierasfer ribbon eel, North American freshwater catfish sole velvet-belly shark cuskfish sand tilefish hammerhead.

Blind shark shark bluntnose knifefish zingel perch pencilfish bobtail snipe eel. Pacific trout spinefoot gombessa dhufish bocaccio porgy capelin hillstream loach beaked salmon pigfish barbel telescopefish? Longfin dragonfish

DI
Piping
0 MT
Steel Structure